• Buckinghamshire residents can use new ‘hybrid’ coronavirus testing site in Slough

Roadworks Ahead For The Ivers - Up to and including July 6th 2020

Roadworks scheduled for The Ivers Parish

Please note that dates are indicative and The Ivers Parish Council has no control over the scheduling of roadworks

 

 

Please note: No access to Household Recycling Centre from Langley Park Road.  Visitors must approach from Trenches Lane only.

 

1 – 26 Jun           Langley Park Road – Wood Lane to County boundary.  Road resurfacing.  Night time road closure.

The following major resurfacing works are planned.  Dates indicate only the window during which the work is expected to take place and not the duration of the works.

9 Apr – 7 Aug      Swan Road.  Resurfacing.  Road closure

13 Apr – 2 Oct     St David’s Close - Entire length. Plane and patch.  Road closure.

13 Apr – 2 Oct     Hardings Row – Entire length. Plane and patch.  Road closure.

13 Apr – 2 Oct     Coopers Row - Entire length. Plane and patch.  Road closure.

13 Apr – 2 Oct     Chequers Orchard - Entire length. Plane and patch.  Road closure.

13 Apr – 2 Oct     Potters Cross - Entire length. Plane and patch.  Road closure.

18 – 22 Jun         Norwood Lane – near bus stop.  Pothole repair.  Road closure.

22 - 23 Jun          Bellswood Lane – Entire length.  Telegraph pole installation.  Road closure.

22 Jun – 1 Jul      Pinewood Road – Entire Length.  Surface dressing.  Road closure.

26 – 29 Jun         M4 Junction 4B-5.  Road closure.

6 – 14 Jul             A412 Church Road – Entire length.  Plane and patch.  Road closure.

Exact timing will be posted two weeks before work is due to commence.

17 – 23 Jun         Bangors Road South – near Bangors Park.  Pothole repair.  Stop/Go boards – Delays likely.

17 – 23 Jun         Bangors Road South – near junction with Norwood Lane.  Pothole repair.  Delays likely

17 Jun - 1 Jul       Bathurst Walk – outside No. 14.  Telecoms works.  Some carriageway incursion – Delays unlikely.

18 – 22 Jun         Thorney Lane South – near junction with Ridgeway.  Streetlight works.  Two-way traffic signals – Delays likely.

18 – 22 Jun         Norwood Lane – near bus stop.  Pothole repair. 

19 – 22 Jun         Cedar Close – outside No. 25.  Telecoms installation.  No carriageway incursion – Delays unlikely.

22 Jun                  B470 Iver Lane – outside No. 44.  Repairs to drain gully.  Stop/Go boards – Delays likely.

22 – 26 Jun         Syke Ings.  Pothole repairs.  Give and take – Delays unlikely.

24 - 25 Jun          A4007 Slough Road – junction with Swallow Street.  Remedial works on footway.  No carriageway incursion – Delays unlikely.

29 Jun - 3 Jul       Love Lane – outside St Just.  Gas main installation.  Two-way traffic lights – Delays possible.

29 Jun – 3 Aug           Chequers Orchard – entire length.  Gas main replacement.  Some carriageway incursion – Delays unlikel

The Ivers Parish Council logo

Contact Us

Iver Parish Council
45B High Street,
Iver,
Buckinghamshire,
SL0 9ND

01753 655331
This email address is being protected from spambots. You need JavaScript enabled to view it.

Twitter Feed